| No. |
Project |
Client |
Title |
Description |
Period / Duration |
55
|
2007/20
|
AQUAFRICA
|
Survey for 3 boreholes in Montepuez, Cabo Delgado
|
Survey in communities for best drilling locations. Both
geophysical profiles and soundings are conducted.
|
1 week
|
54
|
2007/19
|
Água de Goba
|
Supervision of one production borehole
|
Supervision over the construction of 1 production borehole
in Goba
|
1 week |
53
|
2007/18
|
Project ASNANI / DPOPH Nampula / African development
Bank
|
Management Information System
|
Setting up an MIS ssystem, for the water and sanitation
sector in Nampula and Niassa province. Includes stakeholder
analyses and discussion, design, programming, implementation
and tecnical assistance of one year
|
18 months |
52
|
2007/17
|
NEW HORIZONS
|
Plot Mapping in Ribaue, Nampula Province
|
Boundaries definition and existing infrastructure and
particularities mapping in various themes
|
1 week |
51
|
2007/16
|
AquaAfrica
|
Survey for 9 boreholes in Montepuez
|
Geo-physical survey for 9 boreholes in Montepuez dictrict
in Cabo Delgado
|
3 weeks ongoing |
50
|
2007/15
|
Intemon
|
7 borehole sitings in Sofala
|
Geo-physical survey for 7 boreholes in Caia dictrict
in Sofala
|
2 weeeks, ongoing |
49
|
2007/14
|
AquaAfrica
|
Survey for 9 boreholes in Montepuez
|
Geo-physical survey for 9 boreholes in Montepuez dictrict
in Cabo Delgado
|
3 weeks |
48
|
2007/13
|
Tecnopoço
|
Survey for 14 boreholes in Erati
|
Geo-physical survey for 14 boreholes in Erati dictrict
in Nampula
|
3 weeks |
47
|
2007/12
|
JICA
|
Socio-Economic Survey in Zambezia
|
social economic survey concentrating in six villages
without working water points
|
2 month ongoing |
46
|
2007/11
|
Swissta
|
Survey for one production borehole
|
Detailed survey for one production borehole in Macanetta,
Maputo Province
|
1 week |
45
|
2007/10
|
Tecnopoço
|
Survey for seven boreholes in Nacala Velha
|
Geo-physical survey for 7 boreholes in Nacala Velha
|
2 weeks |
44
|
2007/09
|
Modrill
|
Survey of one production borehole
|
Geophysical suvrey for one production borehole in Montepuez,
Cabo Delgado.
|
1 week |
43
|
2007/08
|
Project ASNANI / DPOPH Nampula / African development
Bank
|
Supervision of 15 water points in Nampula
|
Supervision of construction of 15 water points in Mossuril.
|
3 months |
42
|
2007/07
|
Chinese drilling company
|
Training in survey
|
Training of site of Clients staff in effective and successfull
siting
|
1 week
|
41
|
2007/06
|
Project ASNANI / DPOPH Nampula / African development
Bank
|
Supervision of 15 water points in Nampula
|
Addendum 1 to contract 2006/10. Supervision over the
construction of 15 water points in the district of Rapale,
Nampula
|
3 months |
40
|
2007/05
|
JICA
|
Socio-Economic Survey in Zambezia
|
Survey for Sustainable Water Supply, Sanitation and
Hygiene Promotion in Zambezia Province
|
4 months |
39
|
2007/04
|
FDSC (HIVOS)
|
Supervision over 3 waterholes
|
Supervision over the construction of 3 waterholes in
the district of Mogingual
|
1 month |
38
|
2007/03
|
Hidroafrica
|
Survey 46 communities
|
Geophysical studies for 46 communities in six districts
in Niassa to determine the best suitable drilling location
|
3 months |
37
|
2007/02
|
Wateraid
|
Implementing MIS database and mapping two
districts
|
Implementing Database and GIS structure
in Niassa. Technical watersource and community mapping
in two districts
|
3 months |
| 36 |
2007/01 |
Swiss Development Cooperation |
Training course in supervision in Inhambane |
Course in drilling supervision for participants
from NGO, governement and private sector. The course contained
both a theoretical and a practical part, concentrating
on mud drilling |
1 month ongoing |
| 35 |
2006/16 |
Ireland Aid |
Evaluation |
Evaluation of the support of IA to the water
and sanitation sector in 2004-2006. |
1 month ongoing |
| 34 |
2006/15 |
Aka Khan |
Baseline survey in one district in Cabo
Delgado |
Baseline survey for water sources with participative
methods. GIS analyses and data base design |
2 months ongoing |
| 33 |
2006/14 |
Swiss Development Cooperation |
Training course in supervision in Nampula |
Course in drilling supervision for participants
from NGO, governement and private sector. The course contained
both a theoretical and a practical part, concentrating
on air rorary drilling |
1 month |
| 32 |
2006/13 |
DPOPH Zambezia / UNICEF |
Baseline survey in 5 districts |
Training, technical advice, logistics, data
entry and GIS analyses for the collection of water source
and population data in five districts |
6 months ongoing |
| 31 |
2006/12 |
Wateraid Moçambique |
Survey for 50 boreholes in Maua and Nipepe,
Niassa |
Survey in communities for best drilling
location. Both geophysical profiles and soundings are
conducted. |
2 month ongoing |
| 30 |
2006/11 |
Hidroafrica |
Survey for 34 boreholes |
Survey in communities for best drilling
location. Both geophysical profiles and soundings are
conducted. The team remains in the area during drilling
works to evaluate the results. |
2 months ongoing |
| 29 |
2006/10 |
Project ASNANI / DPOPH Nampula / African
development Bank |
Supervision of 50 water points in Memba
district |
Supervision of contractors for 50 water
point construction. Also coordenation with social
consultant. |
8 months
ongoing |
| 28 |
2006/09 |
Carbon services |
Borehole survey |
Executing a comprehensive survey for production
boreholes in Maputo province. Upon the recommended site
a successful borehole was drilled, for which WE Consult
did the supervision |
2 weeks |
| 27 |
2006/08 |
Red Cross |
Survey in 5 villages |
Survey in five communities in Hindane, Maputo
province. Including Aerial Photo Interpretation, mapping
of salinity and geo physical works. |
1 week |
| 26 |
2006/07 |
DAR /OXFAM |
Review of database |
Collecting current status on the national
database system, reviewing the social componant. Visits
included Inhambane, Maputo, Zambezia and Gaza province. |
2 months |
| 25 |
2006/06 |
Agua de Goba |
Survey for one production borehole |
Geophysical study to identify the best drilling
location using geo physical equipment and indicating the
situation with the current borehole and spring |
2 weeks |
| 24 |
2006/05 |
SEED Lda |
Course concerning use of participative methods
in baseline studies |
As preparation for the field work, the Client
received a training in the use of PHAST in order to collect
community information. Also basic GPS usage was included. |
1 week |
| 23 |
2006/04 |
Project ASNANI / DPOPH Nampula / African
development Bank |
Supervision of 50 water points in Nacala-a-velha
district |
Supervision of contractors for 50 water
point construction. Also coordenation with social consultant. |
6 months
ongoing |
| 22 |
2006/03 |
Project ASNANI / DPOPH Nampula / African
development Bank |
Baseline survey in 4 districts: Meconta,
Nacala Porto, Nacaroa, Ilha do Mozambique |
Baseline survey for water sources with participative
methods. GIS analyses and data base design |
8 months |
| 21 |
2006/02 |
DPOPH Zambezia / UNICEF |
Baseline survey in 4 districts, Lugela,
Nicoadala, Inhassunge, Chinde |
Training, technical advice, logistics, data
entry and GIS analyses for the collection of water source
and population data in four districts |
6 months |
| 20 |
2006/01 |
Duys Lda. |
Borehole survey and drilling supervision |
Executing a comprehensive survey for production
boreholes in Maputo province. Supervision of drilling
company |
1 week |
| 19 |
2005/06 |
Salomon Lda |
Course concerning use of participative methods
in baseline studies |
As preparation for the field work, the Client
received a training in the use of PHAST in order to collect
community information. Also basic GPS usage was included. |
1 week |
| 18 |
2005/05 |
Wateraid Mozambique |
Mapping of 2 districts in Niassa Lichinga
and Mandimba |
Training, technical advice, logistics, data
entry and GIS analyses for the collection of water source
and population data in two districts |
4 months |
| 17 |
2005/04 |
World Bank Water and Sanitation Program |
Assessment of National Private Sector Drilling
Capacity for Rural Water Supply in Mozambique |
Study to identifying the sector of active
borehole drilling companies and entrepreneurs in Mozambique
which incorporates amongst others the constraints, legal
framework, equipment and contract issues. Output is database
and dissemination process |
3 months |
| 16 |
2005/03 |
Project ASNANI / DPOPH Nampula / African
development Bank |
Baseline survey in 4 districts Memba, Erati,
Nacala-velha, Mossaril |
Baseline survey for water sources with participative
methods. GIS analyses and data base design |
8 months |
| 15 |
2005/02 |
Wateraid Mozambique |
Mapping of 2 districts in Niassa Maua and
Nipepe |
Training, technical advice, logistics, data
entry and GIS analyses for the collection of water source
and population data in two districts |
4 months |
| 14 |
2005/01 |
Various clients |
Technical assistance and small surveys |
Technical assistance for borehole rehabilitation
and various surveys around Maputo |
2 weeks |
| 13 |
2004/10 |
The Lutheran World Federation, Mozambique |
Geophysical survey in Sofala |
Hydrogeological data and results of resistivity
profiles and soundings have been used to identify 9 suitable
drilling sites in communities in Búzi and Chibabava
district. |
2 weeks |
| 12 |
2004/09 |
Wateraid Mozambique |
Supply Arcview |
Supply and assist installation of three
packages of 9.0 Arcview |
1 week |
| 11 |
2004/08 |
V3 Consultores |
Geophysical survey ISRI |
Surveying the future site of ISRI University
for the possibilities of borehole drilling. Aerial photographs,
maps and geophysical equipment were used |
1 week |
| 10 |
2004/07 |
Wateraid Mozambique |
Mapping 2 districts Zambezia: Namucara,
Namaroi |
Training, technical advice, logistics, data
entry and GIS analyses for the collection of water source
and population data in two districts |
3 months |
| 9 |
2004/06 |
Salomon Lda |
Geophysical survey for landfill |
Surveying the future site of Nampula landfill
for structural features, depth to bedrock and groundwater |
1 week |
| 8 |
2004/05 |
Various clients |
Borehole surveys |
For various private clients, executing a
comprehensive survey for production boreholes in Maputo
provinces |
1 week |
| 7 |
2004/04 |
V3 Consultores |
Water quality analyses |
Water sampling in Chokwe hospital. Biological
and chemical analyses. |
1 week |
| 6 |
2004/03 |
The Lutheran World Federation, Mozambique |
Technical advice for drilling six boreholes
in Gaza province |
Surveying six sites and providing technical
assistance during the drilling of six boreholes |
2 months |
| 5 |
2004/02 |
ASNANI project / DPOPH Nampula / African
development bank |
A baseline survey and the facilitation of
project implementation in Mogovolas District in Nampula |
An baseline survey of all safe water sources
in one district with GIS analyses. Furthermore, mobilisation
of 20 communities and project facilitation |
15 months |
| 4 |
2004/01 |
Development cooperation Ireland |
Feasibility study Marrupa town water supply |
Executing a social economic, hydrological,
hydrogeological and engineering study to evaluate the
best viable option of creating a sustainable town water
supply |
2 months |
| 3 |
2003/03 |
Wateraid Mozambique |
GIS Mapping of Water Sources in Sanga District,
Niassa Province |
An baseline survey of all safe water sources
one district has been undertaken. The report is as planning
tool for DPOPH |
3 months |
| 2 |
2003/02 |
The Lutheran World Federation, Mozambique |
Training course in drilling and hydrogeology |
Training in hydrogeology and drilling of
LWF staff. The training included drilling of 2 boreholes
with LWF equipment. |
1 month |
| 1 |
2003/01 |
Salomon Ltd |
Rental of geophysical equipment |
The geophysical equipment was used for siting
in Cabo Delgado |
1 week |
|
|
|
|
|
|