|
No.
|
Project
|
Client
|
Title
|
Description
|
Period / Duration
|
| 3 |
502
|
ARC
|
Hydrogeological survey for production
borehole and drilling/test-pumping supervision
|
Hydrogeological investigations and
resistivity profiling and soundings were used to identify
a suitable drilling site for a borehole to be supplied
with a submersible pump to supply water to a refugee camp
with 5,000 refugees. Determination of sustainable yield
of the borehole.
|
2 w
|
| 2 |
501
|
Foraky Africa |
Borehole siting for 4 villages
|
Geophysical measurements were carried
out for the JICA Consultant in 4 villages in 2 Districts.
The Consultant was interested in the potential on hill
tops and high on the slopes. The results indicated that
the groundwater potential in these particular areas was
low.
|
2 w
|
| 1 |
401
|
Kibugo Hospital
|
Hydrogeological survey
|
Hydrogeological investigations and
resistivity profiling and soundings were used to identify
a suitable drilling site for a borehole to be equipped
with a handpump
|
1 w
|