Assignment Name:

Country:

Water resources assessment for 25 potential valley tank sites

Uganda

Location within country:

Positions provided by WE Consult:

Luweero, Masindi and Nakasongola Districts

Team Leader

Water Resources Engineer

GIS Specialist

Name and Address of client:

No. of  staff months:

Directorate of Water Development

P.O.Box 20026, Kampala

2

Start Date

(Month / Year)

Completion Date (Month/ Year)

Total contract price of the assignment

06/03

08/03

US $ 7,500

Name of Associated Firm(s), if any:

Name of Senior staff of WE Consult involved:

Kagga and Partners

R.R. Sloots (Team Leader)

M. Iwadra (Water Resources Engineer)

 

Narrative description of project:

As part of a joint venture with Kagga & Partners, WEGS Consultants was responsible for the water resources assessment and analysis of catchment characteristics of 40 sites in order to determine the suitability of the sites for the construction of a valley tank. Kagga & Partners carried out the topographic surveys, the detailed design and the construction supervision. The objective of the project was to supply water to rural areas for domestic and cattle use in areas where no alternative options were feasible. WEGS Consultants carried out a detailed study comprising the analysis of maps, existing population and livestock data and hydro-meteorological data. A Geographical Information System was used to delineate the catchment areas. A detailed procedure and field data collection sheets have been established to be used as reference during the field verification exercise. The combined results of the desk study and the field verification resulted in a final report commenting on each of the 40 sites and recommending 25 sites with the highest potential, taking intop account all social, environmental, technical and economical aspects.

Description of services provided by your staff:

  • Hydrological water and land resources assessment (determination of runoff coefficients, soil erosion etc.)
  • Generation of GIS maps to support decision making
  • Evaluation of general water harvesting potential per site
  • Execution of baseline survey to obtain data on the technical, environmental, social and economical feasibility of 40 proposed dam sites
  • Integration of the full spectrum of characteristics to determine total potential and feasibility per site
  • Evaluation and recommendation to the client