Assignment Name:

Country:

Groundwater Development for two towns in Mid-Western Uganda

Uganda

Location within country:

Positions provided by WE Consult:

Mubende (Mubende District)

Hoima (Hoima District)

Senior Hydrologist

Senior Hydrogeologist

Hydrogeologists

Name and Address of client:

No. of  staff months:

Funding agency:

Mid-Western Towns Water Supply and Sanitation Project (MWTWSP)

Directorate of Water Development

P.O.Box  20026, Kampala

 

20

European Union

Start Date

(Month / Year)

Completion Date (Month/ Year)

Total contract price of the assignment

11/02

08/04

US $ 163,000

Name of Associated Firm(s), if any:

Name of Senior staff of WE Consult involved:

DHV Water B.V.

Kagga & Partners Ltd.

C.W.B. Mulders (Hydrologist)

R.R. Sloots (Sr.Hydrogeologist, Project Manager)

T.O. Olukwita (Hydrogeologist)

E. Bunnya (Hydrogeologist)

 

Narrative description of project:

WE Consult as a sub consultant to DHV Water B.V. carried out all hydrogeological and geophysical investigations in Hoima and Mubende. In addition a groundwater and surface water monitoring networks was set up in all three towns. For the preparation and evaluation of tender documents and the drilling contract supervision, comprising drilling, test-pumping and well logging of 18 production holes in Hoima and 20 production holes in Mubende, WE Consult was contracted directly by DWD.

 

Description of services provided by your staff:

  • Collection and analysis of all available relevant hydrogeological information, including rainfall and evaporation data, borehole data and water samples from existing sources. All data analysed with GIS.
  • Geophysical investigations
  • Design and implementation of surface and groundwater monitoring networks
  • Preparation tender documents for drilling contractors
  • Evaluation of tender documents
  • Drilling, test pumping and well logging supervision
  • Presentation of results through siting and inception report, borehole completion reports and a final report.