Assignment Name:

Country:

Water Resources Assessment Surveys and Evaluation Studies for Town Water Supplies

Uganda

Location within country:

Professional Staff Provided by WE Consult:

Lugazi (Mukono District), Wobulenzi (Luwero District) and Rukungiri (Rukungiri Districts)

 

Mr. R.R. Sloots, Sr. Hydrogeologist

Ms. C.W.B Mulders, Sr. Hydrogeologist

Mr. G. Osiimwe, Jr. Hydrogeologist

 

Name and Address of client:

No. of  staff months:

Funding agency

Small Towns Water and Sanitation Project

(ACE, Mott MacDonald)

P.O. Box 20026, Kampala

4

World Bank

Start Date (Month/Year):

Completion Date:

Value of Services (US $)

Total Value Project (US $)

July 1997

January 1998

15,000

15,000

Name of Associated Firm(s), if any:

No. of Staff Months Provided by Associated Firm:

-

-

Names of Senior staff (Project Director/Coordinator, Team Leader) involved and functions performed:

·        Mr. Ron R. Sloots, Sr. Hydrogeologist involved in planning,  siting, interpretation and reporting

·        Ms. Clarissa W.B. Mulders, Sr. Hydrogeologist involved in project administration, API, and siting exercise

 

Narrative description of project:

Hydrogeological investigations were carried out to determine the groundwater potential in three towns in Uganda. Ultimately, the project aimed at identifying a minimum of 10 sites for the drilling of high-yielding boreholes for the Town water supplies. The investigations were done through the selection of survey sites through desk-study and aerial photograph interpretation, followed by extensive resistivity profiling across inferred fracture zones and soundings on favourable locations. In Lugazi, an additional evaluation of existing hydrogeological data of Lugazi was carried out.

Description of Actual Services Provided by Your Staff:

·        Evaluation of earlier hydrogeological investigations for Lugazi Town

·        Desk-study, API,  planning of geophysical siting phase

·        Execution of sitings through resistivity profiles and soundings, interpretation of measurements and selection of drill sites

·        Final reporting

Description of Outputs and Results :

·        Final Reports on siting results

·        In Rukungiri Town: 5 boreholes with driller’s yields between 2.8 and 31 m3/hr, with an average of 14.8 m3/hr. A total of 3 production wells were selected to accommodate the Town water supply

·        In Lugazi Town: 4 boreholes with driller’s yields between 3 and 24 m3/hr, with an average of 11.6 m3/hr.

·        In Wobulenzi Town: two sites were drilled, with a driller’s yield of 0.8 and 13 m3/hr.