Assignment Name:
|
Country:
|
|
Water Resources
Assessment Surveys and Evaluation Studies for Town Water
Supplies
|
Uganda
|
|
Location within country:
|
Professional Staff Provided by WE Consult:
|
|
Lugazi (Mukono
District), Wobulenzi (Luwero District) and Rukungiri
(Rukungiri Districts)
|
Mr. R.R.
Sloots, Sr. Hydrogeologist
Ms. C.W.B
Mulders, Sr. Hydrogeologist
Mr. G. Osiimwe,
Jr. Hydrogeologist
|
|
Name and Address of client:
|
No. of staff months:
|
Funding agency
|
|
Small Towns
Water and Sanitation Project
(ACE, Mott
MacDonald)
P.O. Box
20026, Kampala
|
4
|
World Bank
|
|
Start Date (Month/Year):
|
Completion Date:
|
Value of Services (US
$)
|
Total Value Project (US
$)
|
|
July 1997
|
January
1998
|
15,000
|
15,000
|
|
Name of Associated Firm(s), if any:
|
No. of Staff Months Provided by Associated Firm:
|
|
-
|
-
|
Names of Senior staff (Project Director/Coordinator,
Team Leader) involved and functions performed:
|
|
·
Mr. Ron R. Sloots, Sr. Hydrogeologist
involved in planning,
siting, interpretation and reporting
·
Ms. Clarissa W.B. Mulders, Sr. Hydrogeologist
involved in project administration, API, and siting
exercise
|
|
Narrative
description of project:
|
|
Hydrogeological
investigations were carried out to determine the groundwater
potential in three towns in Uganda. Ultimately, the
project aimed at identifying a minimum of 10 sites for
the drilling of high-yielding boreholes for the Town
water supplies. The investigations were done through
the selection of survey sites through desk-study and
aerial photograph interpretation, followed by extensive
resistivity profiling across inferred fracture zones
and soundings on favourable locations. In Lugazi, an
additional evaluation of existing hydrogeological data
of Lugazi was carried out.
|
|
Description of Actual Services Provided by Your Staff:
|
|
·
Evaluation of earlier hydrogeological
investigations for Lugazi Town
·
Desk-study, API,
planning of geophysical siting phase
·
Execution of sitings through resistivity
profiles and soundings, interpretation of measurements
and selection of drill sites
·
Final reporting
|
|
Description
of Outputs and Results :
|
|
·
Final Reports on siting results
·
In Rukungiri Town: 5 boreholes with driller’s
yields between 2.8 and 31 m3/hr, with an
average of 14.8 m3/hr. A total of 3 production
wells were selected to accommodate the Town water supply
·
In Lugazi Town: 4 boreholes with driller’s
yields between 3 and 24 m3/hr, with an average
of 11.6 m3/hr.
·
In Wobulenzi Town: two sites were drilled,
with a driller’s yield of 0.8 and 13 m3/hr.
|